सुदूर नेपाललाई विश्वसँग जोड्दै

Patan airport work losing its pace?

२०७५ फाल्गुन १९, ११:५२ स्वीकृती खतिवडा

The construction work of Patan airport, Baitadi, where tarring of the runway was to start, has not yet started. Previously a coordinator from Dinesh Khabar was told by Mr. Nalbikram Thapa, the engineer in charge, that the work would start by 30th December. 

कमेन्ट लोड गर्नुस